The water tank being built at a cost of Rs 2.11 crore has been incomplete for two years – work is being done under the tap water scheme under the Jal Jeevan Mission.
Tag: The water tank being built at a cost of Rs 2.11 crore has been incomplete for two years – work is being done under the tap water scheme under the Jal Jeevan Mission.